ASU Central Plant Renovation and Additions
Project #: | 22-06 |
Detailed Status: | Under Construction |
Building Gross Sq. Ft: | 1,000,000 |
Campus: | ASU San Angelo |
Location: | 2601 W Avenue N |
|
Board Approved Budget: | $36,000,000 |
Adjusted Budget: | $36,000,000 |
|
Project Start Date: | 05.09.2022 |
|
Program Director: | Jeff Sutherland |
Field Observer: | Cody Guins |
Design Professionals: | Sims Architects, Inc |
CM Agent: | Timshel |
|
The existing plant will receive new chilled water & heating water equipment, variable speed centrifugal chiller with chilled water pumps, gas-fired boilers, heating water pumps, and condenser fluid pumps, upgrade electrical equipment, and replace the existing evaporative cooling towers with more efficient water & energy cooling towers.
Piping will be configured to obtain more flexibility & redundancy between the chillers, chilled water pumps & condensing fluid pumps.
The Building Automation System will be upgraded.
The necessity for a new supplemental utility plant is being analyzed based on supply and demand models to resolve flow issues on the expanding west end of campus. |