TTUHSC Lubbock-5B West Research Lab Renovations (CCAP)
Project #: | 23-11 |
Detailed Status: | Stage I Design |
Building Gross Sq. Ft: | 13,670 |
Campus: | HSC Lubbock |
|
Board Approved Budget: | $244,219 |
Adjusted Budget: | $244,219 |
|
Project Start Date: | 05.12.2023 |
|
Program Director: | Rick Richeda |
Field Observer: | Jodie Ellis |
Design Professionals: | Sims Architects, Inc |
CM Agent: | N/A |
|
This project consists of renovating approximately 13,670 square feet of research space located in the west half of Pod B on the fifth floor of the Health Sciences Center building. Research labs and support spaces will be renovated into modern, innovative BSL2/BSL2+ labs. All existing furniture, finishes, and built-in equipment (FFE) will be removed, the floor plan reconfigured, and new FFE installed. All mechanical, electrical, and plumbing systems within the area of renovation will be updated and/or reconfigured. The renovations will result in decreased operating costs, improved efficiency, functionality, collaboration and increased levels of safety, security, and accessibility while providing a positive impression for recruitment. |
Fatal error: Uncaught Error: Call to undefined function each() in \\TECHSHARE.TTU.EDU\AMBASSADOR\fpc\projects\project-status.php:590
Stack trace:
#0 {main}
thrown in \\TECHSHARE.TTU.EDU\AMBASSADOR\fpc\projects\project-status.php on line 590